American Nuclear Society
Home

Home / Publications / Journals / Fusion Science and Technology / Volume 60 / Number 3

Analysis on Initial Tritium Supply for Starting Up Fusion Power Reactor FDS-II

Yong Song, Qunying Huang, Muyi Ni, Xiaoqiang Chen

Fusion Science and Technology / Volume 60 / Number 3 / October 2011 / Pages 1121-1124

Concept and Facility / Proceedings of the Ninth International Conference on Tritium Science and Technology / dx.doi.org/10.13182/FST11-A12612

The initial tritium supply for starting up FDS-II was done by using the Tritium Analysis Software (TAS) developed by FDS Team. The results showed that the initial tritium supply for startup was strongly dependent on the tritium burn-up fraction in plasma and mean residence time of tritium in the plasma exhaust processing system. Considering the sensitive analysis and other advanced designs, the tritium burn-up fraction in plasma was selected to be 0.1 for FDS-II. The minimum initial tritium supply for startup was ~4.2kg. Considering the potential malfunction in the fuel cycle system and assuming the reactor ran continuously before solving the malfunction, it was reasonable to keep the initial tritium supply for FDS-II as ~8.9kg.