Home / Publications / Journals / Nuclear Technology / Volume 84 / Number 3
Nuclear Technology / Volume 84 / Number 3 / March 1989 / Pages 344-349
Technical Paper / Probabilistic Safety Assessment and Risk Management / Fuel Cycle / dx.doi.org/10.13182/NT89-A34218
Articles are hosted by Taylor and Francis Online.
Pressurized water reactor four-batch fuel management represents, in the present context, an economic optimum for the French standardized series of reactors. Plutonium recycling on an industrial scale has already started in France; therefore, it is essential to ascertain its compatibility with four-batch refueling requirements. In the survey considered, it is shown that a core refueled annually with 28 UO2 assemblies, having a 3.7% 235 U content and 12 mixed-oxide assemblies containing 6.5% plutonium, entirely satisfies safety criteria under normal operating conditions. A supplementary survey will be performed to assess its behavior under such accident conditions as steam line break and rod ejection.