American Nuclear Society
Home

Home / Publications / Journals / Fusion Science and Technology / Volume 39 / Number 2P2

Assessment of Personnel Accessibility in the X-1 Facility

H. Y. Khater, M. E. Sawan, R. R. Peterson

Fusion Science and Technology / Volume 39 / Number 2P2 / March 2001 / Pages 1003-1007

Safety and Environment / dx.doi.org/10.13182/FST01-A11963373

Published:February 8, 2018

Hands-on maintenance activities outside the X-1 aluminum chamber may be allowed within a few hours following radiation (photoneutron) shots. Dose rates outside the chamber following moderate yield (200 MJ) shots are four orders of magnitude higher than those following radiation shots. In the mean time, dose rates following high yield (1000 MJ) shots are a factor of five higher than those following moderate yield shots. Hands-on maintenance is allowed outside the chamber and inside the water tank within 10 and 14 days following moderate and high yield shots, respectively. Access to the area outside the water filled tank is allowed after only a few hours following moderate and high yield shots.