Fusion Science and Technology / Volume 14 / Number 2P2A / September 1988 / Pages 472-479
Tritium Processing / Proceedings of the Third Topical Meeting on Tritium Technology in Fission, Fusion and Isotopic Applications (Toronto, Ontario, Canada, May 1-6, 1988) / dx.doi.org/10.13182/FST88-A25177
Articles are hosted by Taylor and Francis Online.
Ontario Hydro's Tritium Removal Facility (DTRF) is presently in its early operating phase. The DTRF was built in order to reduce the average dose rate per worker and tritium emissions in all of Ontario Hydro's CANDU reactors. As a byproduct tritium may be sold to civil users. This paper provides an overview of the system design, commissioning philosophy, program and results. Four areas of the plant are considered separately: