The Licensing Aspects of the Tritium Extraction Plant at the Chalk River Nuclear Laboratories

P.R. Ballantyne

Fusion Science and Technology / Volume 8 / Number 2P2 / September 1985 / Pages 2495-2501

Fission Reactor / Proceedings of the Second National Topical Meeting on Tritium Technology in Fission, Fusion and Isotopic Applications (Dayton, Ohio, April 30 to May 2, 1985) / dx.doi.org/10.13182/FST85-A24654

The Tritium Extraction Plant is being built at the Chalk River Nuclear Laboratories and requires licensing to be operated. Some aspects of this licensing are discussed including the licensing authority and the general licensing procedure of a new facility. Since dose hazard is an important part of the licensing, various aspects of estimating possible doses are discussed. These aspects played a major role in establishing the code to which the plant is being designed and built.