American Nuclear Society
Home

Home / Publications / Journals / Fusion Science and Technology / Volume 4 / Number 2P2

Central Cell Blanket Module Maintenance Approach for the MARS High Temperature Blanket

N. E. Young, D. Sutliff D. Tait, R. Siebert, J. Coulahan, J. K. Garner, J. D. Gordon

Fusion Science and Technology / Volume 4 / Number 2P2 / September 1983 / Pages 234-238

Operations and Maintenance / dx.doi.org/10.13182/FST83-A22874

The Mirror Advanced Reactor Study (Mars) considers two blanket designs: A high temperature helium (1000°C) and lead lithium cooled blanket for synthetic fuels production as well as a simplier lead lithium cooled blanket for electrical power production. These blankets employ fundamentally different maintenance concepts for yearly replacement. A method for replacing this synfuel blanket has been developed and time of removal estimated, Methods for blanket disassembly and preparation for off-site shipment have also been developed and are presented.